Hyderabad Metro: Key Details
The Hyderabad Metro Rail, a state-of-the-art urban transport system, aims to provide efficient, eco-friendly, and comfortable commuting options to Hyderabad’s growing population. With over 69 km operational under Phase 1, the revised extension plan seeks to connect more regions, making the city more accessible.
Key Highlights:
- Operator: L&T Metro Rail (Hyderabad) Limited
- Current Operational Length: 69.2 kms
- Proposed Extension: Over 50 kms planned under Phases 2 and 3
- Total Planned Coverage: 120 kms
Hyderabad Metro: Route & Stations List
Phase 1
Phase 1 is fully operational, covering three corridors:
Corridor | Route | Length (km) | Key Stations |
---|---|---|---|
Corridor 1 | Miyapur to LB Nagar | 29 | Ameerpet, KPHB, LB Nagar |
Corridor 2 | JBS to MG Bus Station | 11 | Parade Ground, Mettuguda |
Corridor 3 | Nagole to Raidurg | 29.2 | Uppal, HITEC City, Raidurg |
Phase 2
The revised Phase 2 extension plan targets underserved areas, including the Hyderabad Airport.
Corridor | Route | Length (km) | Key Stations |
Corridor 4 | Raidurg to Shamshabad (Airport) | 27 Kms | Nanakramguda, Airport |
Corridor 5 | BHEL to Lakdikapul | 20 Kms | Patancheru, Lingampally |
Phase 3
Phase 3 aims to bridge gaps between existing corridors and improve last-mile connectivity.
Proposed Routes | Estimated Length (kms) | Potential Key Stations |
Tarnaka to ECIL | 12 | Tarnaka, Malkajgiri |
LB Nagar to Vanasthalipuram | 10 | LB Nagar, Vanasthalipuram |
Hyderabad Metro: Map
The Hyderabad Metro Rail’s map reflects existing and proposed routes, highlighting key interchanges and extensions.
Hyderabad Metro: Fare and Timings
Category | Details |
Minimum Fare | ₹10 |
Maximum Fare | ₹60 |
Operational Hours | 6:00 AM to 11:00 PM |
Frequency | Every 6-10 minutes during peak hours |
Hyderabad Metro: Impact on Real Estate
The Metro’s extension has had a transformative effect on Hyderabad’s real estate market. Here are the key impacts:
Enhanced Connectivity
The extended metro routes are driving demand in previously underserved areas like Shamshabad and Patancheru, making them hotspots for residential and commercial projects.
Property Appreciation
Area | Average Price Increase (Last 3 Years) |
Uppal | 20% |
Miyapur | 18% |
Shamshabad | 25% |
Boost to Commercial Development
Corridors connecting the IT hub, airport, and industrial zones are spurring the growth of office spaces and co-working hubs.
Conclusion
The Hyderabad Metro extension plan is set to redefine urban mobility, enhance connectivity, and fuel real estate growth. As the city expands, the Metro’s integration into Hyderabad’s infrastructure promises a sustainable and prosperous future.